Skip to main content

“Technical Support for Watershed Management and Resilience Plan for Fort Leonard Wood, MO”

Agency: Dept. of the Army -- Corps of Engineers

Assistance Listings
  • 12.630 -- Basic, Applied, and Advanced Research in Science and Engineering

Archived opportunityLast Updated: May 13, 2026

View version history on Grants.gov

The government seeks research and technical support for watershed management modeling and analyses for water quantity and quality, impacts to aquatic species, and effects of extreme rainfall events to take place at the Fort Leonard Wood, MO area. Details of primary tasks are as follows:


Task 1: Watershed modeling

 

SWAT+ modeling will be completed for the Big Piney River (a HUC 12 watershed) and Roubidoux Creek (part of the Upper Gasconade HUC 12 watershed). The area around FLW is a karst landscape. Models will be calibrated using USGS stream gages and TSS sampling data supplied by FLW and ERDC-CERL. Task 1 consists of 2 (two) subtasks. a) Model(s) will incorporate existing climate and watershed/management conditions, b) model(s) will incorporate the recommended areal coverage of BMP types and management practices into the SWAT+ models to estimate change to water quality and discharge under existing climate conditions, Note: ERDC-CERL will assist with creating recommended BMPs and management practices.

 

Task 2: Assess model output and determine management prioritization

 

Interpretation and evaluation of model results to prioritize watersheds to target with proposed BMPs and management. Analyses will include statistical methods to justify periodization. The cost of BMP implementation and ongoing operations and management cost and the potential water quality and quantity impacts will also be included. Standard maintenance plans for all recommended BMPs will be required.


Task 3: Develop a Watershed Management Plan


Develop a Watershed Management Plan with recommended preliminary designs and locations for future development of LID features and BMPs to protect imperiled aquatic species, reduce infrastructure maintenance costs, and support current and future land usages. The final Watershed Management Plan will be included in the FLW Integrated Natural Resources Management Plan (INRMP) and used by land management groups on FLW including the Directorate of Public Works (DPW), Training, Mobilization & Security (DPTMS), and Integrated Training Area Management (ITAM) as well as the adjacent Mark Twain State Forest.

Eligibility

Eligible applicants

Miscellaneous

  • Other

Additional information

This opportunity is restricted to non-federal partners of the Great Rivers Cooperative Ecosystems Studies Unit (CESU).

Grantor contact information

Description

Stacy Thurman Grantor

Email

Stacy Thurman

stacy.d.thurman@usace.army.mil

Documents

File nameDescriptionLast updated
FOA_W81EWF-24-SOI-0031.pdf
FOA
Jun 24, 2024 04:24 PM UTC

Link to additional information

--

Archived: December 31, 2024

Application process

This site is a work in progress. Go to www.grants.gov to apply, track application status, and subscribe to updates.

Award

$--

Program Funding

--

Expected awards

$--

Award Minimum

$230,000

Award Maximum

Funding opportunity number:

W81EWF-24-SOI-0031

Cost sharing or matching requirement:

No

Funding instrument type:

Cooperative agreement

Opportunity Category:

Discretionary

Opportunity Category Explanation:

--

Category of Funding Activity:

Science technology and other research and development

Category Explanation:

--

History

Version:

1

Posted date:

June 24, 2024

Archive date:

December 31, 2024

HHS.gov

An official website of the U.S. Department of Health and Human Services

Looking for U.S. government information and services? Visit USA.gov