BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS
Agency: Bureau of Reclamation
- 15.509 -- Title II, Colorado River Basin Salinity Control
Closed opportunityLast Updated: May 13, 2026
Important dates
- Closed: September 27, 2023
Electronically submitted applications must be submitted by September 27, 2023, 11:59 p.m. Mountain Daylight Time (MDT).
Award details
- Expected project funding: Not specified
- Expected awards: Not specified
Award min.
$1
Award max.
$40,000,000
- Funding opportunity number:R23AS00353
- Cost sharing or matching requirement:No
- Funding instrument type:
- Cooperative agreement
- Grant
- Opportunity Category:Discretionary
- Opportunity Category Explanation:Not specified
- Category of Funding Activity:
- Other
- Category Explanation:The Colorado River Basin Salinity Control Program (Salinity Control Program) was designed tomeet the objectives of the Colorado River Basin (Basin) Water Quality Standards. Thesestandards include a Plan of Implementation to limit further degradation of water quality in theColorado River that provides water to Southern California, Arizona, Nevada, and New Mexico.The objective of the Salinity Control Program has been to minimize salt loading in the ColoradoRiver system by seeking cost-effective regional solutions to the problem.The Bureau of Reclamation solicits, ranks, and selects new Salinity Control Projects based on acompetitive process open to the public. Cooperative agreements are awarded with selectedapplicants. Projects have typically involved converting unlined canals and ditches to pipelineslocated in the Upper Basin States of Utah, Colorado, New Mexico, and Wyoming to reduceseepage that picks up salt and carries it into the Colorado River system.
History
- Posted date: June 2, 2023
- Archive date: Not specified
- Version: 1
Summary
Jump to documentsEligibility
Miscellaneous
- Other
Additional information on eligibility
Documents
| File name | Description | Last updated |
|---|---|---|
| APPENDIX_E_-_Salt_Load_Reduction_Worksheet.docx | APPENDIX E - Salt Load Reduction Worksheet.docx | Jun 2, 2023 06:37 PM UTC |
| APPENDIX_E_-_Salt_Load_Reduction_Table.pdf | APPENDIX E - Salt Load Reduction Table.pdf | Jun 2, 2023 06:37 PM UTC |
| APPENDIX_B_-_On-Farm_Enable_rev_04-12-2023.xlsx | APPENDIX B - On-Farm Enable rev 04-12-2023.xlsx | Jun 2, 2023 06:37 PM UTC |
| APPLICATION_2023_SALINITY_NOFO.docx | APPLICATION 2023 SALINITY NOFO.docx | Jun 14, 2023 04:46 PM UTC |
| NOFO_R23AS00353_BASINWIDE__BASIN_STATES_SALINITY_CONTROL_PROGRAMS._Revised.pdf | NOFO R23AS00353 BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS. Revised.pdf | Jun 14, 2023 04:48 PM UTC |
| APPENDIX_F_-_Significance_rev_4_6_2023.xlsx | APPENDIX F - Significance rev 4_6_2023.xlsx | Jun 2, 2023 06:38 PM UTC |
| Appendix_A_Cost_Est._Sheet_NOFO_2023.xlsx | Appendix A Cost Est. Sheet NOFO 2023.xlsx | Jun 2, 2023 06:40 PM UTC |
Agency contact information
Email: amanderson@usbr.gov
amanderson@usbr.gov
Link to additional information
No additional information is available
