Cooperative Agreement for affiliated Partner with Great Basin Cooperative Ecosystem Studies Unit
Agency: Geological Survey
- 15.808 -- U.S. Geological Survey Research and Data Collection
Open opportunityLast Updated: Oct 30, 2026
Important dates
- Closing: November 30, 2026
Electronically submitted applications must be submitted no later than 11:59 PM, ET, on the listed application due date
Award details
- Expected project funding: $350,000
- Expected awards: 1
Award min.
$1
Award max.
$350,000
- Funding opportunity number:G27AS00045
- Cost sharing or matching requirement:No
- Funding instrument type:
- Cooperative agreement
- Opportunity Category:Discretionary
- Opportunity Category Explanation:Not specified
- Category of Funding Activity:
- Science technology and other research and development
- Category Explanation:Not specified
History
- Posted date: October 30, 2026
- Archive date: Not specified
- Version: 1
Summary
Jump to documentsThe U.S. Geological Survey (USGS) is offering a funding opportunity to a CESU partner for research to analyze, synthesize, and interpret the latest stream temperature monitoring data in the Lake Tahoe Basin. This project will use the best available science and reproducible analytical methods to evaluate long-term trends, identify ecological thresholds, and support adaptive management. Project activities will be conducted in collaboration with interagency partners and be focused on long-term monitoring data collected and curated by the U.S. Forest Service, Lake Tahoe Basin Management Unit to modernize their 2016 Land Management Plan for water quality/stream temperature monitoring for the Lake Tahoe Basin Management Unit.
Eligibility
Miscellaneous
- Other
Additional information on eligibility
Documents
| File name | Description | Last updated |
|---|---|---|
| ATTACHMENT_A_-_Biographical-sketch-common-form-doi-omb-3145-0279_3..pdf | ATTACHMENT A - Biographical-sketch-common-form-doi-omb-3145-0279 3..pdf | Oct 30, 2026 04:06 PM UTC |
| ATTACHMENT_B_-_Common-form_current-and-pending-support-doi-omb-3145-0279_3..pdf | ATTACHMENT B - Common-form current-and-pending-support-doi-omb-3145-0279 3..pdf | Oct 30, 2026 04:06 PM UTC |
| ATTACHMENT_C_-_Project_Abstract_Summary_Requirement..docx | ATTACHMENT C - Project Abstract Summary Requirement..docx | Oct 30, 2026 04:07 PM UTC |
| ATTACHMENT_D_-_Geospatial_Data_Instructions..docx | ATTACHMENT D - Geospatial Data Instructions..docx | Oct 30, 2026 04:07 PM UTC |
Agency contact information
Email: Rachel_miller@ios.doi.gov
Rachel_miller@ios.doi.gov
Link to additional information
No additional information is available
