“Technical Support for Watershed Management and Resilience Plan for Fort Leonard Wood, MO”
Agency: Dept. of the Army -- Corps of Engineers
- 12.630 -- Basic, Applied, and Advanced Research in Science and Engineering
Archived opportunityLast Updated: May 13, 2026
View version history on Grants.gov
Description
The government seeks research and technical support for watershed management modeling and analyses for water quantity and quality, impacts to aquatic species, and effects of extreme rainfall events to take place at the Fort Leonard Wood, MO area. Details of primary tasks are as follows:
Task 1: Watershed modeling
SWAT+ modeling will be completed for the Big Piney River (a HUC 12 watershed) and Roubidoux Creek (part of the Upper Gasconade HUC 12 watershed). The area around FLW is a karst landscape. Models will be calibrated using USGS stream gages and TSS sampling data supplied by FLW and ERDC-CERL. Task 1 consists of 2 (two) subtasks. a) Model(s) will incorporate existing climate and watershed/management conditions, b) model(s) will incorporate the recommended areal coverage of BMP types and management practices into the SWAT+ models to estimate change to water quality and discharge under existing climate conditions, Note: ERDC-CERL will assist with creating recommended BMPs and management practices.
Task 2: Assess model output and determine management prioritization
Interpretation and evaluation of model results to prioritize watersheds to target with proposed BMPs and management. Analyses will include statistical methods to justify periodization. The cost of BMP implementation and ongoing operations and management cost and the potential water quality and quantity impacts will also be included. Standard maintenance plans for all recommended BMPs will be required.
Task 3: Develop a Watershed Management Plan
Develop a Watershed Management Plan with recommended preliminary designs and locations for future development of LID features and BMPs to protect imperiled aquatic species, reduce infrastructure maintenance costs, and support current and future land usages. The final Watershed Management Plan will be included in the FLW Integrated Natural Resources Management Plan (INRMP) and used by land management groups on FLW including the Directorate of Public Works (DPW), Training, Mobilization & Security (DPTMS), and Integrated Training Area Management (ITAM) as well as the adjacent Mark Twain State Forest.
Eligibility
Eligible applicants
Miscellaneous
- Other
Additional information
Grantor contact information
Description
Stacy Thurman
Documents
| File name | Description | Last updated |
|---|---|---|
| FOA_W81EWF-24-SOI-0031.pdf | FOA | Jun 24, 2024 04:24 PM UTC |
Link to additional information
--
Archived: December 31, 2024
Award
$--
Program Funding
--
Expected awards
$--
Award Minimum
$230,000
Award Maximum
Funding opportunity number:
W81EWF-24-SOI-0031
Cost sharing or matching requirement:
Funding instrument type:
Cooperative agreement
Opportunity Category:
Discretionary
Opportunity Category Explanation:
Category of Funding Activity:
Science technology and other research and development
Category Explanation:
History
Version:
1
Posted date:
June 24, 2024
Archive date:
December 31, 2024
