Research and Development for Biological Control of Arundo Donax
Agency: Engineer Research and Development Center
Assistance Listings: 12.630 -- Basic, Applied, and Advanced Research in Science and Engineering
Last Updated: February 13, 2025
Funding opportunity
Summary
A. Short Description of Funding Opportunity
ERDC seeks applications for: evaluation of biological control for Arundo donax in southern California. There is potential for at least two distinct projects to arise from this opportunity, including determination of optimal release and monitoring strategies for A. donax biological controls, and evaluation of the impact of biological control on A. donax water-use efficiency, growth, and biomass allocation.
B. Background
...Giant cane is a large (4-8m tall) perennial grass native to western Asia and likely introduced into North America from Spain in the early 1500s, but now is widespread with considerable capacity for expansion in North America (Figure 1; Moran and Goolsby 2022). Reproduction is solely clonal in the US and occurs through extensive rhizome networks or fragmentation. Large knotty rhizomes form underground masses up to three feet thick and provide a source of regrowth following management. Giant cane infests disturbed habitats near water and is particularly harmful in arid environments where it outcompetes other species and has extremely high water-use (Figure 2) (Seawright et al. 2009, Racelis et al. 2012, Goolsby et al. 2016). In fact, giant cane was estimated to transpire 56,200 acre-feet of water per year on the Santa Ana River alone, which equates to serving approximately 190,000 people in an area known for droughts and at a potential municipal cost of $25M in lost water (Iverson 1993).
Figure 1. Habitat suitability for Arundo donax in the US, based on model outputs from INHABIT (USGS). (See FOA)
Costs of giant cane management near Los Angeles can exceed $250K per acre, due to the effort required for repeated herbicide applications, then subsequent biomass and sediment management. Giant cane infestations have reduced the channel conveyance capacity of the Los Angeles River (at the Glendale neighborhood) from a 25-year storm event to a 2-year storm event where it impacts over 6000 people and risks $1B in property value. There is interest in using biological control as a sustaining management tool for giant cane in California, but a lack of information about whether agents could be used under the conditions present in project areas has prevented its widespread implementation.
Figure 2. Representative giant cane infestations within the SPL AOR A) Los Angeles River at Glendale Narrows, B) Whittier Narrows, C) Santa Ana River, D) Rio Hondo. (See FOA)
Two biological control agents are approved to manage giant cane in California (Figure 3): Tetramesa romana, the Arundo gall wasp, and Rhizaspidiotus donacis, the Arundo armored scale (CAL-IPC 2020). Both agents are established in the US and have been used to successfully control giant cane infestations in Texas (Goolsby et al. 2014, Goolsby et al. 2016). Additional releases and control monitoring is ongoing in northern California but, to date, there is insufficient data to inform their use in Southern California. It has been suggested that biological control of giant cane will be most successful in areas with sufficient warming days (Marshall et al. 2018). A previous assessment found Ventura/ Oxnard, CA to have relatively low number of warming days compared to locations in south Texas where control has been successful, but other warmer locations in California, such as parts of Los Angeles County, may be better suited for a biological control program.
C. Program Description/Objective:
The following objectives summarize the objectives and deliverables expected for each year of the agreement.. Over the life of the cooperative agreement (5 years), it is anticipated that 5 projects would be completed.
Year 1. Objective- Determine Arundo control metrics relevant to USACE operations. Deliverable: Baseline site characterization / dataset report.
Year 2. Objective- Initiate Arundo donax biological control release and establishment approaches and continue data collection on control impacts to USACE operations. Deliverable: Report on short-term population changes in A. donax and biocontrol agents related to establishment approach.
Year 3. Objective- Continue Arundo donax biological control release and establishment approaches and data collection on control impacts to USACE operations. Deliverable: Interim report on mid-term population changes in A. donax and biocontrol agents related to establishment approach.
Year 4. Objective- Continue Arundo donax biological control release and establishment approaches and data collection on control impacts to USACE operations. Deliverable: Interim report on mid-term population changes in A. donax and biocontrol agents related to establishment approach and changes in operational impacts due to control.
Year 5. Objective- Determine Arundo control relative to USACE operations. Deliverable: Final site characterization / report describing change in site characteristics due to biological control of Arundo.
Eligibility
Eligible applicants
Other
Additional information
Grantor contact information
Description
Stacy Thurman
Documents
--
Link to additional information
--
Closing: April 14, 2025
Award
$395,000
Program Funding
1
Expected awards
$120,000
Award Ceiling
$--
Award Floor
Funding opportunity number:
W81EWF-25-SOI-0004
Cost sharing or matching requirement:
Funding instrument type:
Cooperative agreement
Opportunity Category:
Discretionary
Opportunity Category Explanation:
Category of Funding Activity:
Science technology and other research and development
Category Explanation:
History
Version:
2
Posted date:
February 12, 2025
Archive date:
December 31, 2025